dirtbert.com/Natural Resources

Benesch Natural ResourcesBenesch Geotechnical

Natural Resources

Our Natural Resources group puts seven services on one track: environmental, permitting, grant assistance, wetland permitting, Native American affairs, geotechnical, and hydraulics and hydrology. One team carries a project from what is in the ground and the water to the permits, the funding and the consultations it needs. Pick a car to see what it carries.

  1. LocomotiveNatural Resources
  2. Car 1Environmental
  3. Car 2Permitting
  4. Car 3Grant Assistance
  5. Car 4Wetland Permitting
  6. Car 5Native American Affairs
  7. Car 6Geotechnical
  8. Car 7Hydraulics and Hydrology
CAR 1 · BNRX 2101

Environmental

NEPA documents, site assessments and compliance programs, from planning through operation.

  • CEs, EAs and EISs
  • Phase I and II ESAs and compliance audits
  • Species surveys and agency coordination
Open Environmental →
CAR 2 · BNRX 2102

Permitting

The federal, state and local permits a project needs, applied for early and kept in compliance through construction.

  • Section 404/401 and state water permits
  • Stormwater and erosion and sediment control permits
  • Permit conditions tracked through construction
Open Permitting →
CAR 3 · BNRX 2103

Grant Assistance

We find the federal programs that fit and write applications that score.

  • Bridge Investment Program
  • CRISI and TAP
  • Merit-criteria narratives
Open Grant Assistance →
CAR 4 · BNRX 2104

Wetland Permitting

We find and map wetlands and streams, permit the impacts and design the mitigation.

  • Wetland and stream delineation
  • Nationwide, joint and individual permits
  • Mitigation design and monitoring
Open Wetland Permitting →
CAR 5 · BNRX 2105

Native American Affairs

Early, government-to-government consultation with tribal nations, carried through the federal process.

  • Section 106 and 4(f) support
  • NEPA and tribal consultation
  • Work with BIA, BIE and DOI bureaus
Open Native American Affairs →
CAR 6 · BNRX 2106

Geotechnical

Drilling, testing, analysis and construction support, and ground hazard programs that keep track in service.

  • Subsurface exploration and lab testing
  • Railroad ground hazard risk management
  • Slopes, walls, foundations and subgrade
Open Geotechnical →
CAR 7 · BNRX 2107

Hydraulics and Hydrology

Flood flows, culvert and bridge hydraulics, scour and drainage: modeled, designed and permitted.

  • Watershed hydrology and design flows
  • Culvert and bridge hydraulics, HEC-RAS
  • Scour, drainage and stormwater
Open Hydraulics and Hydrology →

One consist, one schedule

Each car is a service, coupled to the same locomotive. Geotechnical and hydraulics and hydrology work feed the design, environmental and wetland findings feed the permits, tribal consultation starts early, and grants help fund the work. Geotechnical tools and project pages (Analysis Suite, Project Status, Drilled Shaft Testing, NS Bridge – Ashtabula, CSX Third Track, NECR Slope Program) are in the Geotechnical car.