| ProjectExample Siding Extension — Embankment Widening | Project no.000000.00 | Client railroad[Railroad] | Subdivision / MP[Sub.] MP 000.0 |
| Station / offsetSta. 00+00, 25 ft Lt. of CL main | Latitude / longitude00.00000° / −00.00000° | Ground surface elev. (ft)745.0 (NAVD 88) | Total depth (ft)25.0 |
| Drilling contractor[Contractor] | Rig / methodTrack-mounted rig / 3¼-in. HSA; NX core | HammerAutomatic, 140 lb, 30 in. drop | Energy ratio (ER)55% (calibrated) |
| Date started / completed__/__/____ / __/__/____ | Logged by[Name], [Title] | Checked by[Name], P.E. | Weather[Conditions] |
| Elev.ft | Depthft | Graphic log | Sample | SPT (ASTM D1586) | Material descriptionConsistency/density, color, moisture, SOIL NAME (USCS), other; geologic unit | Index tests | Remarks / lab tests | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| No. | Type | Rec.in. | Blows / 6 in. | N60 01020304050 | w% | LL/PI | −200% | |||||
| 745.0 | 0–2.5 | FILL — Silty SAND (SM), brown, moist; ballast fragments and cinders in upper 1 ft | ||||||||||
| 742.5 | 2.5–4 | SS-1 | SS | 14 | 2-3-3 | Loose, brown, moist, silty fine SAND with gravel (SM) — fill | 12.4 | w | ||||
| 740.0 | 5–6.5 | SS-2 | SS | 16 | 3-4-4 | Medium dense, brown, moist, silty fine SAND (SM) | 10.8 | w | ||||
| 737.5 | 7.5–9 | SS-3 | SS | 18 | 2-2-2 | ALLUVIUM — Soft, gray, wet, lean CLAY (CL) | 24.1 | 42/22 | 82 | w, LL, PL, −200 | ||
| 735.0 | 10–12 | ST-1 | ST | 22 | push | Soft, dark gray, wet, fat CLAY (CH); LL = 68, PL = 28 | 38.5 | 68/40 | 92 | Consol. (D2435), UU (D2850), γd = 78.2 pcf | ||
| 732.5 | 12.5–14 | SS-4 | SS | 18 | 1-1-2 | Very soft, dark gray, wet, fat CLAY (CH) | 42.1 | w | ||||
| 730.0 | 15–16.5 | SS-5 | SS | 16 | 1-2-2 | Soft to firm, gray, wet, fat CLAY (CH) | 36.8 | w | ||||
| 727.5 | 17.5–19 | SS-6 | SS | 15 | 3-4-4 | RESIDUUM — Medium dense, red-brown, moist, clayey SAND (SC) | 9.2 | w | ||||
| 725.0 | 20–21.5 | SS-7 | SS | 17 | 6-8-10 | Dense, red-brown, moist, clayey SAND (SC) | 8.1 | w | ||||
| 723.0 | 22–25 | RC-1 | NX | REC 94% RQD 78% | 50/3″ | BEDROCK — Greenstone, hard, slightly weathered, gray-green; joints moderately close, rough, iron-stained. Auger refusal at 22.0 ft; cored 22.0–25.0 ft | Point load (D5731) | |||||
| Boring terminated at 25.0 ft in bedrock · Backfilled with bentonite-cement grout | ||||||||||||
| ▽ Encountered during drilling | 8.0 ft (El. 737.0) | ▼ At completion of drilling | 7.2 ft (El. 737.8) |
| ▼ Stabilized (24 hr after completion) | 6.8 ft (El. 738.2) | Date / method | __/__/____ · tape in open hole |
| SS · Split-spoon sample (ASTM D1586) | ST · Shelby tube (ASTM D1587) | NX / HX · Rock core bit size |
| N · Blows for last 12 in. of 18-in. drive | N60 = N × ER/60 (ER = hammer energy ratio, %) | 50/3″ · 50 blows for 3 in. penetration (refusal) |
| REC · Core recovery; RQD per ASTM D6032 | w · Moisture (D2216); LL/PI (D4318); −200 (D1140) | Consol. (D2435); UU (D2850); PLT (D5731) |
| Logged by | Checked by | Approved by (P.E.) / license no. / state | P.E. SEAL |