dirtbert
Geotechnical engineering library
Contact

About me

Dan Colwell

Civil & Geotechnical Engineer · Raleigh, NC

For more than 30 years I've worked out what the ground under railroads, highways, and buildings is going to do, and what to do about it.

Career log

Drawn like a boring log: most recent at the surface, each layer sized to the years spent there.

Benesch

Jan 2021 – present · Remote

Senior Manager, Special Geotechnical Projects

Formalized the firm's Ground Hazard Risk Management program and added a likelihood × consequence risk-rating framework. Proposals, client meetings, subsurface and groundwater investigations, borrow sites, foundation and earthwork testing.

Loose to medium dense, still accumulating.

Atlas Technical Consultants

Jan – Nov 2020 · Highland, IN

Branch Manager / Senior Geotechnical Engineer

Ran a 12-person branch: geotechnical, materials lab, construction inspection, budgets, safety audits.

Wood

Jun 2018 – Jan 2020 · Nashville, TN

Senior Geotechnical Engineer, Rail Engineering & Construction

Ground hazard and geotechnical engineering for five Class I railroads: CN, CSXT, NS, BNSF, and UP.

Canadian National Railway

Jul 2007 – May 2018 · Memphis · Joliet · Homewood, IL

Assistant Project Manager, then Senior Geotechnical Engineer

Built CN's ground hazard risk management program from the ground up. Led geotechnical scope on the Harrison Yard reconstruction, and standardized engineering risk practice across the EJ&E network after CN acquired it.

Stiff, thick, well-consolidated. Foundation layer.

Burns Cooley Dennis

Aug 2006 – Jul 2007 · Memphis, TN

Geotechnical Engineer

Tennessee DOT

Jun 2005 – Sep 2006 · Memphis, TN

Operations Specialist

John D. Hynes & Associates

Jul 2002 – Feb 2005 · Salisbury, MD

Staff Engineer

Second stint on the Delmarva Peninsula.

Continental Engineering

Aug 1998 – Jul 2002 · Memphis, TN

Civil Design Engineer

John D. Hynes & Associates

Apr 1996 – Jul 1998 · Salisbury, MD

Staff Engineer

Anderson Consulting Engineers

Sep 1994 – Apr 1996 · Little Rock, AR

Project Engineer

Construction Quality Consultants

Sep 1993 – Sep 1994 · Memphis, TN

Technician

Memphis Light, Gas & Water

Jan 1990 – May 1993 · Memphis, TN

GIS Operator

B.S. in Civil Engineering, Christian Brothers University, 1992.

End of boring at 1990. Groundwater not encountered.

What I work on

The four kinds of work I'm most often called in for.

Ground hazard risk management

I've built the same program at three firms: inventory the slopes, cuts, fills, and drainage along a network, rate each site by likelihood and consequence, and turn that into a capital program a railroad can act on.

Rail roadbed & embankments

Subgrade and embankment stability, washout and derailment response, yard reconstruction. Done with track time and train schedules in mind.

Subsurface investigation

Borings, groundwater studies, borrow-site evaluation, GPR interpretation, and the analysis and reports that follow (Settle3, LPile, PCASE).

Project & team management

Proposals, budgets, client relationships, field crews, and a full branch office. I can run the project, not just the analysis.

Background

Education, certification, and committee work.
  • B.S., Civil Engineering · Christian Brothers University1992
  • Engineer Intern (EI/EIT)Certified
  • AREMA Committee 1, RoadbedMember
  • AREMA Committee 8, Concrete Structures & FoundationsMember
  • TTCI (Transportation Technology Center, Inc.)Chair, 2017–18
  • Class I railroads worked with5

Get in touch

Ground hazard related defects getting unbearable? We can help.

Email me