| ProjectExample Siding Extension — Embankment Widening | Project no.000000.00 | Client railroad[Railroad] | Report date__/__/____ |
| Laboratory[Laboratory name] | Accreditation[e.g., AASHTO re:source; USACE] | Tested by[Name] | Reviewed by[Name], P.E. |
| Boring | Sample | Depth (ft) | USCS | Gradation (D6913 / D1140) | Atterberg limits (D4318) | w (%) | γd (pcf) | Gs | Tests / remarks | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Gravel % | Sand % | Fines % | LL | PL | PI | ||||||||
| B-1 | SS-1 | 2.5–4.0 | SM | 2 | 71 | 27 | NP | NP | NP | 12.4 | — | — | D2216, D6913 |
| B-1 | SS-3 | 7.5–9.0 | CL | 0 | 18 | 82 | 42 | 20 | 22 | 24.1 | — | — | D2216, D4318, D1140 |
| B-1 | ST-1 | 10.0–12.0 | CH | 0 | 8 | 92 | 68 | 28 | 40 | 38.5 | 78.2 | — | D2216, D4318, D7263 |
| B-3 | ST-1 | 18.0–20.0 | CH | 0 | 6 | 94 | 71 | 29 | 42 | 42.1 | 76.5 | 2.72 | D854, D2435 |
| Boring | Sample | Depth (ft) | Test (ASTM) | Undrained | Effective stress | Consolidation (D2435) | Remarks | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| su (tsf) | εf (%) | c′ (psf) | φ′ (°) | Cc | Cr | σ′p (tsf) | cv (ft²/day) | Cα | |||||
| B-1 | ST-1 | 10.0–12.0 | D2850 (UU) | 0.24 | — | — | — | — | — | — | — | — | σ3 = 0.5 tsf |
| B-3 | ST-1 | 18.0–20.0 | D2435 | — | — | — | — | 0.59 | 0.14 | 1.50 | 0.15 | — | Casagrande σ′p |
| B-6 | ST-1 | 12.0–14.0 | D4767 (CU) | — | — | 200 | 31 | — | — | — | — | — | 3-point, with pore pressure |
| Source / location | Material | Test (ASTM) | Moisture–density | Bearing / stiffness | Remarks | ||||
|---|---|---|---|---|---|---|---|---|---|
| γd,max (pcf) | wopt (%) | Effort | Soaked CBR (%) | Swell (%) | Mr (psi) | ||||
| Borrow-1 | CL fill | D1557 | 118.2 | 14.0 | Modified | 24.3 | — | — | CBR at 95% RC, 96-hr soak (D1883) |
| Borrow-2 | SM fill | D1557 | 126.5 | 10.5 | Modified | 51.8 | — | — | CBR at 95% RC, 96-hr soak (D1883) |
| TP-3 subgrade | CL natural | D1557 | 116.8 | 15.2 | Modified | 12.6 | — | 4,200 | Mr at 95% RC (AASHTO T 307) |
| Tested by / date | Laboratory manager / date | Reviewed by (P.E.) / date | QC duplicate check (10%) |