dirtbert
Geotechnical engineering library
Contact

Training

Field training

Self-paced courses for inspectors and engineers working on railroad and transportation foundations. Each course ends with an exam and a certificate of completion.

Courses

Open a course to sign in. Sign-ins last 12 hours.

🔒 Sign-in
Field training · self-paced

Drilled Shaft Testing & Inspection

Integrity testing and inspection of drilled shafts, from SQUID and SHAPE through crosshole sonic logging, thermal integrity profiling and the pile driving analyzer, to reinforcing steel and concrete testing. A certification exam at the end issues a certificate of completion.

  • 9 sections
  • Certification exam
  • Certificate on passing
  • Sign-in required

Course sections

  1. 01Introduction
  2. 02SQUID
  3. 03SHAPE
  4. 04CSL testing
  5. 05Thermal integrity profiler
  6. 06Crosshole sonic logging
  7. 07Pile driving analyzer
  8. 08Reinforcing steel inspection
  9. 09Concrete testing
  10. ExamCertification exam
Need a sign-in? Request access. The course uses the same sign-in as the Benesch area.