↑ Parent Menu⌂ Main Menu
← Railway Ground Hazard Risk Management
Benesch benesch
Railway Ground Hazard Risk Management · Part V · Subsurface Exploration
Sections · click a car to open it

Chapter 7 — In Situ Testing

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing.
Authors: Daniel P. Colwell and Mario Ruel

Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations (2001), Sections 4-5 through 4-12; ASTM D5778, D2573, D4719, D6635, D7128; AREMA Manual for Railway Engineering (MRE) Chapter 1.

Apps for this Chapter3

Apps on dirtbert.com that support this chapter. Each one runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (I.3). Tools marked TOOLS open in the Geotechnical Analysis Suite (Benesch sign-in); the orange card below lists each one by section.

NANCY pages ask you to accept the Use and Disclaimers once in each browser.

Analytical Tools for this Chapter5

Calculators and workbook tools from the Benesch Geotechnical Analysis Suite that support this chapter: 2 interactive calculators and 3 workbook guides. Each one is also placed inside the section it supports, in an orange tools strip.

SPDynamic Cone PenetrometerUsed in 7.2 Cone Penetration Test (CPT and CPTu)Calculator ▸Guide
FFDynamic Cone Field LogUsed in 7.2 Cone Penetration Test (CPT and CPTu)Calculator ▸Guide
SPCPT–SPT CorrelationUsed in 7.2 Cone Penetration Test (CPT and CPTu)guide onlyGuide
SPVane ShearUsed in 7.3 Vane Shear Test (VST)guide onlyGuide
SSSeismic Site Class DeterminationUsed in 7.6 Multichannel Analysis of Surface Waves (MASW)guide onlyGuide

Tools open on dirtbert.com and need the Benesch sign-in. Drafts pending Benesch final review, not for use in design.

Reference Graphics
Executive Summary

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing. For railroad geotechnical investigations conducted on behalf of CSXT, NSR, UPRR, BNSF, CPKC, Amtrak, CN, G&W subsidiaries, and in conformance with AREMA MRE Chapter 1, we routinely deploy six primary in situ methods: the Cone Penetration Test (CPT/CPTu), the Vane Shear Test (VST), the Pressuremeter Test (PMT), the Flat Dilatometer Test (DMT), Multichannel Analysis of Surface Waves (MASW), and seismic refraction. Each method addresses a specific subsurface condition or design need. This chapter presents the theoretical basis of each method with equations expressed in English units (psf, pcf, psi, ft, ksf), step-by-step worked calculation examples set in railroad project contexts, client-specific application guidance, a method comparison table, a field operations checklist, and five practice questions with complete answers. Cross-references to Chapter 6 (SPT corrections), Chapter 8 (soil classification), Chapter 11 (bearing capacity), Chapter 12 (settlement), Chapter 13 (slope stability), and Chapter 14 (seismic/liquefaction) are provided throughout.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

Empirical Equations — Use and Limitations

The correlations below are used or referenced in this chapter. Each is a statistical fit to a particular data set, so a value from one is an estimate: it applies only within the materials and ranges stated, carries the scatter of the original data, and must be confirmed by site-specific testing or calibration before it is relied on for design.

When an equation is used, note it with the result: give the equation ID and source, state that the soil or rock is within its range of applicability, mark the value as correlated (not tested), and record the limitation that governs. The Empirical Equations & Correlations reference has every entry with its full references.

Referenced in this chapter

IS-12Corrected cone resistanceqₜ
qt = qc + u2 (1 − an)

Variables. u2 = pore pressure behind cone tip; an = net area ratio (typically 0.70–0.85, from calibration)

Use. All piezocone (CPTu) soundings; essential in soft clays and silts.

Limitations. Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.

Source. Lunne et al. 1997 · In this chapter: 7.9, 7.12, 7.13, 7.14 · Full entry and references

IS-14Undrained shear strength from CPTSᵤ
Su = (qt − σv0) / Nkt

Variables. Nkt = empirical cone factor, typically 10–20 (average ≈ 14); decreases with increasing Bq

Use. Fine-grained soils penetrated undrained (Ic > ~2.6).

Limitations. Nkt depends on reference test (vane, CIUC, DSS) and plasticity; calibrate locally. Use Nkt toward upper end for conservative Su.

Source. Lunne et al. 1997 · In this chapter: 7.9, 7.12, 7.14 · Full entry and references

IS-18Shear-wave velocity from CPTVₛ
Vs = [ αvs · (qt − σv0) / Pa ]0.5   (m/s)
αvs = 10(0.55 Ic + 1.68)

Variables. Ic from IS-13

Use. Young, uncemented Holocene–Pleistocene soils.

Limitations. Underpredicts Vs in aged or cemented soils. Measure Vs directly for seismic site class.

Source. Robertson 2009 · In this chapter: 7.1, 7.8 · Full entry and references

IS-23Flat dilatometer (DMT) intermediate parametersI_D, K_D, E_D
ID = (p1 − p0)/(p0 − u0)
KD = (p0 − u0)/σ'v0
ED = 34.7 (p1 − p0)

Variables. p0, p1 = corrected A and B pressures; u0 = hydrostatic pore pressure

Use. All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand.

Limitations. ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).

Source. Marchetti 1980 · In this chapter: Executive Summary, 7.5, 7.8, 7.12, 7.13, 7.14 · Full entry and references

IS-24OCR, K₀ and Sᵤ of clay from DMTOCR, K₀, Sᵤ
OCR = (0.5 KD)1.56
K0 = (KD/1.5)0.47 − 0.6
Su = 0.22 σ'v0 (0.5 KD)1.25

Variables. KD from IS-23

Use. Uncemented, unaged clays with ID < 1.2.

Limitations. Not valid in sands, cemented, or heavily aged deposits; check against lab or vane data.

Source. Marchetti 1980 · In this chapter: 7.8 · Full entry and references

IS-25Field vane strength correctionSᵤ (field)
Su,field = μ · Su,FV
μ = 1.7 − 0.54 · log(PI)

Variables. PI = plasticity index (%)

Use. Soft clays, embankment stability on soft ground; based on back-analyzed failures. Typical PI 5–100%.

Limitations. Not applicable to fissured, varved, or organic clays without local calibration. Scatter about ±25%.

Source. Azzouz et al. 1983 (fit to Bjerrum 1972) · In this chapter: 7.12, 7.14 · Full entry and references

IX-09At-rest earth pressure coefficientK₀
K0,NC = 1 − sin φ'
K0,OC = (1 − sin φ') · OCRsin φ'

Variables. φ' = effective friction angle

Use. Uncemented soils on primary unloading.

Limitations. Not valid on reloading or for compacted fills, where K0 is governed by compaction stresses. Cap at passive limit.

Source. Jaky 1944; Mayne & Kulhawy 1982 · In this chapter: 7.14 · Full entry and references

IX-13Small-strain shear modulus (Hardin)G_max
Gmax = 625 · F(e) · OCRk · Pa0.5 · σ'm0.5
F(e) = 1 / (0.3 + 0.7 e2)

Variables. σ'm = mean effective stress; k = 0 (PI=0) to 0.5 (PI ≥ 100)

Use. Uncemented clays and sands; lab resonant-column basis.

Limitations. Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.

Source. Hardin 1978 · In this chapter: 7.1, 7.8, 7.12, 7.14 · Full entry and references

Also applicable to this chapter

IS-13Soil behaviour type index (normalized)I꜀ / Qₜₙ / Fᵣ
Qtn = [(qt − σv0)/Pa] · (Pa/σ'v0)n
Fr = [fs / (qt − σv0)] × 100%
Ic = [ (3.47 − log Qtn)2 + (log Fr + 1.22)2 ]0.5
n = 0.381 Ic + 0.05 (σ'v0/Pa) − 0.15   (n ≤ 1.0; iterate)

Variables. fs = sleeve friction

Use. All CPT data; basis for SBT classification and most Robertson-family correlations below. Ic < 2.6 ≈ coarse-grained / drained; > 2.6 ≈ fine-grained / undrained.

Limitations. SBT is behaviour type, not grain-size classification. Cemented, aged, or sensitive soils plot misleadingly. Earlier n-exponent forms exist (Robertson & Wride 1998).

Source. Robertson 2009 · Full entry and references

IS-15Friction angle of sand from CPTφ'
φ' = 17.6 + 11.0 · log [ (qt/Pa) / (σ'v0/Pa)0.5 ]

Variables. Bracketed term = Qt1 (normalized tip resistance)

Use. Clean, unaged, uncemented quartz sands; based on calibration chamber data.

Limitations. Overpredicts in compressible (carbonate, micaceous) sands; underpredicts in aged/cemented sands.

Source. Kulhawy & Mayne 1990 · Full entry and references

IS-16Relative density of sand from CPTDᵣ
Dr2 = Qt1 / (305 · QC · QOCR · QA)
Qt1 = (qt/Pa)/(σ'v0/Pa)0.5;   QOCR = OCR0.18;   QA = 1.2 + 0.05 log(t/100)

Variables. QC = compressibility factor (0.91 low, 1.00 medium, 1.09 high compressibility); t = age in years

Use. Clean quartz sands; calibration chamber database.

Limitations. Chamber size effects in dense sands; sensitive to compressibility assumption.

Source. Kulhawy & Mayne 1990 · Full entry and references

IS-17Preconsolidation stress / OCR from CPTσ'ₚ, OCR
σ'p ≈ k · (qt − σv0)
OCR = σ'p / σ'v0
k ≈ 0.33 (range 0.2–0.5)

Variables. k = empirical factor

Use. Intact, inorganic clays.

Limitations. k is higher in aged/heavily OC clays and lower in fissured clays; calibrate with oedometer tests.

Source. Kulhawy & Mayne 1990; Mayne 1995 · Full entry and references

IS-19Constrained modulus from CPTM
M = αM · (qt − σv0)
Ic > 2.2: αM = Qt when Qt ≤ 14; αM = 14 when Qt > 14
Ic ≤ 2.2: αM = 0.0188 · 10(0.55 Ic + 1.68)

Variables. Qt = (qt − σv0)/σ'v0

Use. Uncemented soils; settlement estimates (1-D).

Limitations. Gives a representative 1-D modulus at in-situ stress; not small-strain. Organic and sensitive soils excluded.

Source. Robertson 2009 · Full entry and references

IS-20Hydraulic conductivity from CPTk
1.0 < Ic ≤ 3.27:   k = 10(0.952 − 3.04 Ic)   (m/s)
3.27 < Ic < 4.0:   k = 10(−4.52 − 1.37 Ic)   (m/s)

Variables. Ic from IS-13

Use. Naturally deposited soils; first-order profiling of k with depth.

Limitations. Order-of-magnitude only (±1 log cycle). Not for man-made fills; prefer CPTu dissipation t50 or field pumping tests for design.

Source. Robertson 2010 · Full entry and references

IS-21Soil unit weight from CPTγ
γ / γw = 0.27 · log Rf + 0.36 · log (qt/Pa) + 1.236

Variables. Rf = (fs/qt) × 100%; γw = unit weight of water

Use. Uncemented soils; used to build stress profiles when samples are lacking.

Limitations. Typical accuracy about ±10%; poor in organic soils, peats, and cemented layers.

Source. Robertson & Cabal 2010 · Full entry and references

7.1 Background and Role of In Situ Testing in Railroad Investigations

Railroad embankments, bridges, culverts, and intermodal facilities impose repetitive dynamic loads that sensitize soft or marginally competent soils in ways that static design loads alone do not capture. The Cooper E-80 live load equivalent used by all Class I clients — CSXT, NSR, UPRR, BNSF, CPKC, Amtrak, and CN — combined with dynamic load factors (DLF) of 1.2 to 1.5 (see Introduction, Table I-3) means that subgrade characterization must resolve not only static strength and stiffness but also cyclic response. In situ testing is indispensable for this because:

  1. Soft clays and organic soils — common in CSXT's Atlantic Coastal Plain corridor, Amtrak's Northeast Corridor (NEC) estuarine deposits, CN's Great Lakes shoreline alignments, and G&W's Gulf Coast subsidiaries — cannot be sampled and tested without significant disturbance unless a fixed-piston sampler is used. The VST and CPTu provide undisturbed strength measurements directly in the ground.
  2. Liquefaction screening (Chapter 14) requires normalized CPT tip resistance (q_c1N) that cannot be obtained from SPT alone on Amtrak NEC projects where piezocone (CPTu) is now a preferred method per Amtrak Engineering Standards (ES).
  3. Stiffness profiling for dynamic track modulus — increasingly requested by BNSF and UPRR for mainline heavy-haul corridors — requires small-strain shear modulus (G_max) from MASW or seismic CPT.
  4. Rippability assessment for rock cuts on NSR's Appalachian routes and CPKC's Canadian Shield crossings is efficiently accomplished by seismic refraction before committing to diamond core drilling programs.
  5. G&W subsidiaries operating short-line or regional networks often lack the budget for extensive drilling but can receive substantial value from MASW profiling combined with selective SPT borings, a strategy endorsed in AREMA MRE Chapter 1, Section 1.5.

Reference graphics · click to zoom

Geotechnical Investigation Beyond SPT
Geotechnical Investigation Beyond SPT
Supplemental reference · LEVI Library

In-situ tests adapted for the trackbed

Access under traffic limits most in-situ tests to the shoulder or a track window. McHenry and Rose (2012) summarize the tools that can be run from the track or crib: the dynamic cone penetrometer and the instrumented French PANDA (records blow energy and penetration to give dynamic cone resistance qd), the light weight deflectometer, the German DyStaFiT dynamic plate test, and rail-bound stiffness vehicles (Track Loading Vehicle, Portancemètre). They also note that seismic CPT is attractive for railroads because a small-strain modulus better reflects the small cyclic strains under train loads than a resilient modulus does.

Source: McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky

In situ test methods and their applicability

Profillidis reproduces a matrix of in situ test methods (from Carter and Bentley, Correlations of Soil Properties) rating each method’s applicability to soil identification, profiling and engineering parameters across soil types. He notes that before 1960 the list would have held only the standard penetration test, the mechanical cone, the vane shear test and the plate load test. Today several methods can usually supply any given parameter, so the choice can be driven by soil type, depth and cost.

Figures · click to zoom

Figure 7-11. In situ soil test methods and their applicability (A = high, B = moderate, C = low, – = none). Profillidis Table 9.1, after Carter and Bentley (1991).
Figure 7-11. In situ soil test methods and their applicability (A = high, B = moderate, C = low, – = none). Profillidis Table 9.1, after Carter and Bentley (1991).

After Profillidis (2014), §9.2.3, Table 9.1; after Carter, M. and Bentley, S. (1991), Correlations of Soil Properties, Pentech Press. Full reference under Supplemental Sources.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-18 Shear-wave velocity from CPT VₛUse: Young, uncemented Holocene–Pleistocene soils. Limits: Underpredicts Vs in aged or cemented soils. Measure Vs directly for seismic site class.
  • IX-13 Small-strain shear modulus (Hardin) G_maxUse: Uncemented clays and sands; lab resonant-column basis. Limits: Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.
7.2 Cone Penetration Test (CPT and CPTu)

Reference graphics

Cone Penetration Test
Cone Penetration Test
7.2.1 Test Procedure and Equipment

The CPT advances a 1.41-in.-diameter cone at a rate of 0.8 in./sec per ASTM D5778. The standard cone has a projected tip area of 1.55 in² and a friction sleeve area of 23.25 in². The piezocone (CPTu) adds a porous filter element — typically at the u₂ position (shoulder behind tip) — to measure pore water pressure during advancement. Amtrak ES explicitly requires CPTu (not basic CPT) for all soft-ground investigations on the NEC where settlement risk exists, citing the need for B_q pore pressure ratio data to assess consolidation state.

Measurements recorded per ASTM D5778:

  • q_c — measured tip resistance (tsf or psi)
  • f_s — sleeve friction (psi or ksf)
  • u₂ — pore water pressure at shoulder (psi) [CPTu only]
7.2.2 Corrected Tip Resistance

For CPTu, the measured tip resistance is corrected for unequal area effects:

Equation 7-1 — Corrected Total Tip Resistance:

q_t = q_c + u₂ × (1 − a)

Where:

  • q_t = corrected total tip resistance (tsf)
  • q_c = measured tip resistance (tsf)
  • u₂ = measured pore water pressure at shoulder (tsf); [Note: 1 psi = 0.072 tsf; 1 tsf = 13.89 psi]
  • a = net area ratio of cone (dimensionless); typically 0.75–0.85; confirm from manufacturer certificate
7.2.3 Friction Ratio and Soil Behavior Type

The friction ratio is used for soil behavior type (SBT) classification:

Reference graphics · click to zoom

CPT Interpretation
CPT Interpretation
Equation 7-2 — Friction Ratio:

R_f (%) = (f_s / q_c) × 100

Robertson (1990) SBT zones are used to classify soil type without physical samples. A simplified guide:

SBT ZoneR_f (%)q_c (tsf)Typical Soil
1>4<5Sensitive fine-grained
2>35–25Organic / peat
32–45–50Clay — low to medium OCR
41–210–100Silt mixture
50.5–1.550–200Sand mixture
6<0.5>100Clean sand
8<0.5>300Dense sand / gravel
9>2>100Very stiff fine-grained

This table is routinely incorporated into CPTu data reports delivered to CSXT, BNSF, and UPRR in their respective gINT templates.

7.2.4 Undrained Shear Strength from CPTu (N_kt Method)

No additional content.

Reference graphics

CPT for Cohesive Soils
CPT for Cohesive Soils
Equation 7-3 — Undrained Shear Strength:

s_u = (q_t − σ_v) / N_kt

Where:

  • s_u = undrained shear strength (tsf)
  • q_t = corrected tip resistance (tsf)
  • σ_v = total vertical stress at depth of interest (tsf) = γ × z / 2,000 [γ in pcf, z in ft, result in tsf]
  • N_kt = cone factor (dimensionless); typically 10–18; use 14 for normally consolidated clays unless site-calibrated
Equation 7-4 — Pore Pressure Ratio:

B_q = (u₂ − u₀) / (q_t − σ_v)

Where u₀ = hydrostatic pore pressure (tsf) = γ_w × h_w / 2,000; γ_w = 62.4 pcf, h_w = depth below water table (ft). B_q > 0.4 typically indicates soft, normally consolidated or sensitive clay — a critical flag on Amtrak NEC and CN Great Lakes alignments.

7.2.5 Normalized CPT Parameters for Liquefaction Screening

Chapter 14 presents the full liquefaction procedure; the key normalized parameter needed from CPT is:

Equation 7-5 — Normalized Tip Resistance:

q_c1N = (q_c / P_a) × (P_a / σ'_v)^0.5

Where:

  • q_c = measured tip resistance (tsf); P_a = 2,117 psf = 1.058 tsf
  • σ'_v = vertical effective stress (tsf)
  • q_c1N = dimensionless; used directly in CRR correlation (Youd et al. 2001)

UPRR and BNSF both accept CPT-based liquefaction screening per this method for preliminary hazard assessments on new intermodal yard sites.

Supplemental reference · LEVI Library

Normalized soil behavior type and the index Ic

The non-normalized zones in Section 7.2.3 drift with depth because qc rises with overburden. Robertson’s normalized chart (Figure 7-S1) removes that effect and collapses the zone boundaries into one number:

Ic = [ (3.47 − log Qt)2 + (log Fr + 1.22)2 ]0.5, with Qt = (qt − σvo)/σ′vo and Fr = fs/(qt − σvo) × 100%.

ZoneSoil behavior typeIc(qc/pa)/N60
1Sensitive, fine grainedN/A2.0
2Organic soils – clay> 3.61.0
3Clays – silty clay to clay2.95–3.61.5
4Silt mixtures – clayey silt to silty clay2.60–2.952.0
5Sand mixtures – silty sand to sandy silt2.05–2.603.0
6Sands – clean sand to silty sand1.31–2.055.0
7Gravelly sand to dense sand< 1.316.0
8Very stiff sand to clayey sand*N/A5.0
9Very stiff fine-grained*N/A1.0

* Heavily overconsolidated or cemented. Normalized SBT has better than 80% agreement with samples in independent studies (Robertson & Cabal, 2010). Apply the q/N ratios to qt in soft fine-grained soils.

Dissipation tests and ch

Stopping the push and recording pore-pressure decay gives t50, the time to 50% dissipation, which yields the horizontal coefficient of consolidation (Robertson and Cabal report accuracy of about ± half an order of magnitude but excellent repeatability within a profile). Convert to vertical with cv = ch(kv/kh). Watch for dilative silts where u2 rises before it falls — run the test to true equilibrium, or measure t50 from the peak. In plastic clays dissipation can take many hours, so budget rig time accordingly on track-window-limited projects.

CPT calibration checks

Robertson and Cabal recommend recording zero-load readings at the start and end of every sounding and checking wear, O-ring seals, push rods and the pore-pressure filter at the start and end of each test, with load-cell calibration at least every three months (or before and after major projects).

Source: Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.

Supplemental figures · LEVI Library
Normalized CPT soil behavior type (SBT<sub>N</sub>) chart, Q<sub>t</sub>&ndash;F<sub>r</sub>, with I<sub>c</sub> boundaries and trends for OCR, density and sensitivity (Robertson, 1990; updated 2010).
Supplemental Figure 7-S1. Normalized CPT soil behavior type (SBTN) chart, Qt–Fr, with Ic boundaries and trends for OCR, density and sensitivity (Robertson, 1990; updated 2010). Source: Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc., p. 27.

Case: CPT with boreholes at Lac la Biche Sub Mile 173.48

About 400 ft of track at Lac la Biche Sub Mile 173.48 was settling differentially into deep peat. Boreholes (including DH-1 and DH-3) built the stratigraphic section, and a track-mounted CPT rig filled in between them to define the depth and extent of the organic layer. The resulting design used 68 piles of 18-in. diameter, installed in two flights at 10° from vertical, to carry track load through the peat (see Chapter 11). Simple hand checks also help: at Tête Jaune Mile 40.5, clay that a thumb could penetrate several centimeters ruled out heavy equipment and rain-day work.

Figures · click to zoom

Figure 7-12. Track-mounted CPT rig at Lac la Biche.
Figure 7-12. Track-mounted CPT rig at Lac la Biche.
Figure 7-13. Borehole log used to build the peat cross-section.
Figure 7-13. Borehole log used to build the peat cross-section.
Figure 7-14. Field consistency check by boot and thumb at Tête Jaune.
Figure 7-14. Field consistency check by boot and thumb at Tête Jaune.

After Geotechnology for Railroaders Program, Module 6.2, Module 6.1; Module 6.2 §05; Module 6.1 §03. Full reference under Supplemental Sources.

7.3 Vane Shear Test (VST)
7.3.1 Test Procedure

The field vane shear test (ASTM D2573) measures peak and remolded undrained shear strength of soft to firm cohesive soils. A four-bladed vane (standard dimensions: 2.24 in. diameter × 4.49 in. height, H/D = 2) is pushed to the test depth and rotated at 6°/minute. The test is suited to soft clays with s_u < 1.0 tsf. It is inappropriate in sands, gravels, or stiff clays.

Specific applications by railroad client:

  • CSXT — soft Atlantic Coastal Plain clays along the Seaboard corridor; VST is specified in CSXT Engineering Standards for embankment stability assessments on sensitive clays.
  • Amtrak NEC — marine clays in the Baltimore-Philadelphia segment; VST combined with CPTu per Amtrak ES.
  • CN — Leda (quick) clays in the St. Lawrence Lowlands require VST as a sensitivity verification tool; sensitivity S_t > 8 triggers slope stability re-analysis per CN Engineering Standards.
  • G&W Gulf Coast subsidiaries — Mississippi Delta and Louisiana alluvial clays frequently exhibit s_u < 0.25 tsf; VST is the primary strength measurement tool in these areas.
7.3.2 Peak Undrained Shear Strength from Torque

No additional content.

Equation 7-6 — Peak Undrained Shear Strength:

For H/D = 2 (standard vane):

s_u (peak) = T_peak / [π × D³ × (H/(2D) + 1/6)]

Where:

  • T_peak = peak torque (lb·ft)
  • D = vane diameter (ft); standard D = 2.24 in. = 0.187 ft
  • H = vane height (ft); standard H = 4.49 in. = 0.374 ft

Substituting H/D = 2:

s_u (peak) = T_peak / [π × D³ × (1 + 1/6)]

= T_peak / [π × D³ × 7/6]

= 6 × T_peak / (7 × π × D³)

Converting result from lb/ft² to tsf: divide by 2,000.

7.3.3 Bjerrum Correction for Anisotropy and Strain Rate

Field vane s_u overestimates design undrained strength in plastic clays because the test is faster than field loading rates and the failure plane is not optimally oriented. The Bjerrum (1972) correction factor μ is applied:

Equation 7-7 — Corrected Design s_u:

s_u (design) = μ × s_u (field vane)

Where μ is a function of plasticity index (PI):

PI (%)μ (Bjerrum 1972)
101.00
200.95
400.85
600.75
800.65
100+0.55

For CSXT embankment stability analyses on Atlantic Coastal Plain soft clays (typical PI = 40–65%), μ = 0.75–0.85 is standard practice.

7.3.4 Sensitivity

No additional content.

Equation 7-8 — Sensitivity:

S_t = s_u (peak) / s_u (remolded)

CN Engineering Standards flag S_t > 8 as "quick clay" requiring project-level risk assessment and slope stability analysis under seismic loading per Chapter 13 and Chapter 14.

7.4 Pressuremeter Test (PMT)
7.4.1 Test Procedure

The prebored pressuremeter test (ASTM D4719) is performed in a borehole by expanding a cylindrical membrane against the borehole wall and measuring volume change versus applied pressure. The self-boring pressuremeter (SBP) minimizes disturbance but is rarely warranted on standard railroad projects. The full-displacement PMT (FDPMT) is useful in soft clays and has been used on Amtrak NEC foundation studies.

Three pressure phases define the PMT curve:

  1. Pseudo-elastic phase — reloading of borehole wall; slope gives pressuremeter modulus E_PMT
  2. Plastic phase — progressive yielding; yield pressure p_f
  3. Creep / limit pressure — membrane reaches limit pressure p_L at large expansion
7.4.2 Pressuremeter Modulus

No additional content.

Equation 7-9 — Pressuremeter Modulus:

E_PMT = 2(1 + ν) × V_m × ΔP/ΔV

Where:

  • E_PMT = pressuremeter modulus (psf or ksf)
  • ν = Poisson's ratio (0.33 for drained, 0.50 for undrained)
  • V_m = mean volume of cavity during elastic phase (ft³) = (V_0 + V_f)/2; V_0 = initial borehole volume, V_f = volume at end of elastic phase
  • ΔP/ΔV = slope of pressure–volume curve in elastic phase (psf/ft³)

For preliminary design, E_PMT is correlated to elastic modulus of soil (E_s) for settlement analysis (Chapter 12) using E_s ≈ E_PMT / α, where α = 0.33 for OC clays and 0.67 for NC clays (Ménard 1975).

7.4.3 Limit Pressure and Undrained Shear Strength

No additional content.

Equation 7-10 — Undrained Shear Strength from PMT:

s_u = (p_L − p_0) / N_p

Where:

  • p_L = limit pressure (ksf or psf)
  • p_0 = at-rest horizontal total stress (psf) = K₀ × σ'_v + u₀
  • N_p = PMT bearing capacity factor; typically 6.2–7.5 for clays

The PMT is particularly useful on NSR projects through the Appalachian ridges where borings encounter interbedded rock and soft clay, and CPT advancement is impractical.

7.5 Flat Dilatometer Test (DMT)
7.5.1 Test Procedure

The Marchetti flat dilatometer (ASTM D6635) is a blade with a flexible 2.36-in. diameter steel membrane pushed into the ground. Two pressure readings are taken at each depth: the "A" pressure (membrane lift-off) and the "B" pressure (membrane expansion to 0.043 in.). A third reading "C" (deflation) is optional but recommended in soft clays for pore pressure estimation.

The DMT provides three intermediate parameters:

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

Equation 7-11 — Material Index (I_D):

I_D = (p_1 − p_0) / (p_0 − u₀)

Equation 7-12 — Horizontal Stress Index (K_D):

K_D = (p_0 − u₀) / σ'_v

Equation 7-13 — Dilatometer Modulus (E_D, psf):

E_D = 34.7 × (p_1 − p_0)

Where p_0 and p_1 are corrected contact and expansion pressures (psf); correction equations (ASTM D6635 Annex A1) account for membrane stiffness gauge factors ΔA and ΔB.

Soil classification by I_D:

I_DSoil Type
< 0.6Clay
0.6 – 1.8Silt
> 1.8Sand

K_D interpretation: K_D ≈ K₀ for NC soils; K_D > 2 indicates overconsolidation. OCR ≈ (K_D / 1.5)^1.56 (Marchetti 1980) — widely applied on CSXT and BNSF soft-ground projects.

7.5.2 Constrained Modulus and Settlement

No additional content.

Equation 7-14 — Constrained Modulus (M_DMT, psf):

M_DMT = R_M × E_D

Where R_M is a correction factor (dimensionless):

  • R_M = 0.14 + 2.36 log(K_D) for I_D < 0.6 (clay)
  • R_M = 0.62 + 0.96 log(K_D) for I_D between 0.6 and 3.0 (silt to sand)
  • R_M = 1.0 for I_D > 10

M_DMT is analogous to 1/m_v used in Terzaghi consolidation theory and can substitute for oedometer data in settlement calculations (Chapter 12) when tube sampling is impractical.

7.6 Multichannel Analysis of Surface Waves (MASW)

Reference graphics

In Situ & Geophysical Methods — SPT, MASW, SRT, ERT, CHST, DHST, PIT
In Situ & Geophysical Methods — SPT, MASW, SRT, ERT, CHST, DHST, PIT

Reference graphics · click to zoom

Cross-hole Seismic Test (chst)
Cross-hole Seismic Test (chst)
7.6.1 Principle and Equipment

MASW (ASTM D7128) measures the dispersion of Rayleigh surface waves to derive a shear-wave velocity (V_s) profile with depth. A linear array of 24 or more 4.5-Hz vertical geophones spaced 3.3–9.8 ft apart is deployed at the surface. An impact source (sledgehammer, weight drop) generates surface waves. The dispersion curve is inverted to yield V_s versus depth.

MASW offers a non-invasive site characterization option that UPRR and BNSF have increasingly required for mainline subgrade rehabilitation projects where track occupancy windows preclude drilling. CPKC has incorporated MASW into its track-structure interaction studies on prairie mainline segments. CN uses MASW extensively for permafrost boundary mapping and muskeag (peat bog) thickness profiling in Canadian operations.

7.6.2 Small-Strain Shear Modulus

No additional content.

Equation 7-15 — Small-Strain Shear Modulus:

G_max = ρ × V_s²

Where:

  • G_max = small-strain shear modulus (psf)
  • ρ = soil mass density (slug/ft³) = γ / g = γ (pcf) / 32.2 (ft/s²)
  • V_s = shear-wave velocity (ft/s)

Example: For a sand with γ = 120 pcf and V_s = 820 ft/s:

  • ρ = 120 / 32.2 = 3.727 slug/ft³
  • G_max = 3.727 × (820)² = 3.727 × 672,400 = 2,507,285 psf ≈ 1,254 tsf

G_max is the input stiffness for dynamic track-subgrade interaction models used by UPRR and BNSF for high-axle-load corridors (315K GRL).

7.6.3 AASHTO / AREMA Site Class from V_s,30

The AASHTO seismic site classification is based on the time-averaged shear-wave velocity in the upper 100 ft, V_s,30:

Equation 7-16 — Time-Averaged V_s in Upper 100 ft:

V_s,30 = Σd_i / Σ(d_i / V_si)

Where d_i and V_si are thickness (ft) and shear-wave velocity (ft/s) of each layer in the upper 100 ft.

Site ClassV_s,30 (ft/s)Description
A> 5,000Hard rock
B2,500–5,000Rock
C1,200–2,500Very dense soil / soft rock
D600–1,200Stiff soil
E< 600Soft clay
F—Special study required

All AREMA MRE Chapter 8 seismic bridge design and UPRR, BNSF, CSXT, NSR, CN, and Amtrak seismic analysis protocols reference AASHTO site class directly. MASW is the most practical tool for establishing site class when bedrock is too deep for refraction and borings are not available at every bridge location.

7.7 Seismic Refraction

Reference graphics

Geophysical Methods
Geophysical Methods
7.7.1 Principle

Seismic refraction measures the first-arrival travel times of compressional (P-wave) energy from a surface source to a linear array of geophones. When the P-wave velocity (V_P) of a deeper layer exceeds that of the surface layer, refracted waves arrive at distant geophones before the direct wave, producing a characteristic two-slope travel-time curve. The crossover distance and slopes define layer velocities and depths.

NSR routinely requires seismic refraction surveys ahead of rock cut design in the Appalachian Mountains to determine:

  • Depth to competent rock (rippability assessment)
  • Whether blasting will be required (regulatory trigger on CN Canadian projects under Transport Canada Railway Safety Act)
  • Whether auger vs. drill-and-blast excavation is feasible (cost driver for CPKC Rocky Mountain alignments)
7.7.2 Layer Depth from Two-Layer Model

For a simple two-layer model (V₁ over V₂, V₂ > V₁):

Equation 7-17 — Crossover Distance:

x_c = 2 × h × √((V₂ + V₁) / (V₂ − V₁))

Equation 7-18 — Layer 1 Thickness:

h = (x_c / 2) × √((V₂ − V₁) / (V₂ + V₁))

Where:

  • h = thickness of layer 1 (ft)
  • x_c = crossover distance (ft) — where direct and refracted travel-time lines intersect
  • V₁ = P-wave velocity of layer 1 (ft/s)
  • V₂ = P-wave velocity of layer 2 (ft/s)

Rippability guidance (Caterpillar D9, D11):

V_P (ft/s)RippabilityImplication
< 5,000EasyNo blasting; rippable with D9
5,000–8,000ModerateD11 may be required
8,000–12,000DifficultBlasting likely required
> 12,000Not rippableBlasting required; verify with NSR / CPKC permit requirements

CN's Explosives Regulatory Division and CPKC's Rule G.4.1 require advance notification and permit for any blasting within 300 ft of active track; seismic refraction results are attached to the blasting permit application.

Supplemental reference · LEVI Library

Picking the right surface geophysical method

Refraction and MASW are only two of the tools available. The USACE decision matrix (EM 1110-1-1802, Table 2-1) rates each surface method against the question being asked. W = works well in most materials; S = works only under favorable conditions; blank = not recommended.

MethodLithologyTop of rockRipp­abilityWater tableFaultsVoids / cavitiesIn-situ moduliMaterial boundariesBuried ferrous objects
Seismic refractionSWWSSWS
Seismic reflectionSSSSSW
DC resistivitySSSSSSS
ElectromagneticsSSS
Ground-penetrating radarSSSSSS
GravitySSS
MagneticsSW

Only refraction is rated “works well” for top of rock and rippability; every void-detection method is conditional, which is why karst and mine-void screening on rail corridors normally combines two methods (e.g., resistivity plus microgravity or GPR) and confirms anomalies with borings. USACE also stresses writing explicit objectives into the geophysical contract and including a field-release clause so a method that is not working can be stopped after a short trial near ground truth.

Source: U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802

7.8 Method Comparison and Selection Guide
MethodPrimary OutputBest Suited SoilsRailroad Application
CPT / CPTuq_c, f_s, u₂Sands to soft claysLiquefaction screening (UPRR, BNSF); settlement (Amtrak NEC, CSXT)
VSTs_u, S_tSoft to medium claysEmbankment stability (CSXT, CN, G&W); quick clay (CN)
PMTE_PMT, p_LAll soils; rock (SBP)Foundation modulus (NSR, Amtrak); stiff interbedded soils
DMTI_D, K_D, M_DMTSoft clays to dense sandsOCR, settlement input (BNSF, CSXT); subgrade assessment
MASWV_s profile, G_maxAll soils / rockSite class, G_max (UPRR, BNSF, CPKC); muskeg thickness (CN)
Seismic RefractionV_P, layer depthsRock / stiff soilsDepth to rock, rippability (NSR, CPKC, CN)

Selection hierarchy:

  1. If settlement governs → CPTu + DMT (primary), VST (soft clay verification)
  2. If liquefaction governs → CPTu preferred over SPT alone per Amtrak ES; MASW for G_max
  3. If rock depth / rippability governs → Seismic refraction first; supplement with borings
  4. If dynamic stiffness governs → MASW primary; seismic CPT if depth resolution needed
  5. If budget is limited (G&W short-line) → MASW + selective SPT borings; skip PMT unless abutment design is involved
Supplemental reference · LEVI Library

How far to trust an SPT–CPT conversion

Converting between N and qc is routine when a corridor has old SPT borings and new CPT soundings. A Florida DOT data set (six sites, safety-hammer SPT, electric CPT) shows the limits:

Soil (USCS)Linear fit (qc in MPa)R2
Fine sand (SP)qc = 0.291N + 2.430.60
Silty fine sand (SM)qc = 0.12N + 5.00.35
Silty clayey fine sand (SM/SC)qc = 0.22N + 2.60.37
Fine sand with silt (SP-SM)qc = 0.15N + 7.20.11
Clayey fine sand (SC)qc = 0.06N + 5.70.09

Only clean sand gave a usable correlation, and its qc/N ratio matched the published values; sands with more than about 10% fines scattered badly and had higher qc/N than the literature. Treat a converted N or qc as a screening value. For design, calibrate with side-by-side SPT and CPT at a few stations in each geologic unit, and prefer the Robertson soil-behavior-type ratios (above) over a single constant.

Source: Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2) · Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.

Selecting in situ tests for track subgrade

Only two things need answering. For track subgrade, in situ testing has to establish strength (bearing) and stiffness (deformation), plus where the layering changes. Tests support design in one of two ways:

  • Indirectly: test result → soil parameter → design method. For example, vane su → bearing capacity.
  • Directly: test result → performance through a correlation. For example, CPT qc → subgrade modulus (Er ≈ 14 qc) → track modulus (Chapter 2, §2.6).
Table 7-SW1. Suitability of in situ tests for su and deformation in cohesive soils
TestVery soft claySoft clayMedium clayStiff claySilty claySilt
Field vaneAABCCD
CPTAAABBC
CPTuAAABBC
DMTAAAAAB
PMTBBAABC
SPTDCBAAA

A = high suitability; B = moderate; C = limited; D = not applicable.

Strengths and limitations.

  • In situ tests reach soils that are hard to sample, test a larger volume, give a near-continuous profile, and are quick and inexpensive.
  • Their drainage and boundary conditions are not known, the disturbance they cause is not known, they load the soil differently from track, at higher strain rates, and they say little about behavior under repeated load.

Choosing the test. CPT, vane and DMT depend least on the operator. Where stratigraphy is complex or variable, use more of a cheaper test. Where it is simple, fewer, more expensive tests are acceptable.

After Selig & Waters (1994), chs. 4 and 10. Full reference under Supplemental Sources.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

7.9 Worked Examples
Example 7-1 — CPTu Soft Clay Characterization, CSXT Atlantic Coastal Plain

Context: We are performing a CPTu sounding to support embankment widening on CSXT's Seaboard Subdivision near Savannah, GA. At a depth of 22 ft, the following data are recorded:

  • q_c = 4.20 tsf (measured tip resistance)
  • u₂ = 1.80 tsf (pore water pressure at shoulder)
  • Net area ratio a = 0.80
  • Unit weight of soil γ = 108 pcf
  • Water table at 4 ft depth
  • γ_w = 62.4 pcf

Step 1 — Corrected tip resistance (Eq. 7-1):

q_t = q_c + u₂ × (1 − a)

= 4.20 + 1.80 × (1 − 0.80)

= 4.20 + 0.36

= 4.56 tsf

Step 2 — Total vertical stress:

σ_v = γ × z = 108 pcf × 22 ft = 2,376 psf = 1.188 tsf

Step 3 — Pore water pressure (hydrostatic):

u₀ = γ_w × h_w = 62.4 × (22 − 4) = 62.4 × 18 = 1,123 psf = 0.562 tsf

Step 4 — Effective vertical stress:

σ'_v = σ_v − u₀ = 1.188 − 0.562 = 0.626 tsf

Step 5 — Undrained shear strength (Eq. 7-3, N_kt = 14):

s_u = (q_t − σ_v) / N_kt

= (4.56 − 1.188) / 14

= 3.372 / 14

= 0.241 tsf = 482 psf

Step 6 — Pore pressure ratio (Eq. 7-4):

B_q = (u₂ − u₀) / (q_t − σ_v)

= (1.80 − 0.562) / (4.56 − 1.188)

= 1.238 / 3.372

= 0.367

Interpretation: B_q = 0.37 indicates a normally to lightly overconsolidated soft clay — consistent with Atlantic Coastal Plain alluvium. s_u = 482 psf is consistent with soft to medium clay classification (Chapter 8). This value feeds directly into CSXT embankment stability analysis (Chapter 13, Bishop Simplified method).

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-14 Undrained shear strength from CPT SᵤUse: Fine-grained soils penetrated undrained (Ic > ~2.6). Limits: Nkt depends on reference test (vane, CIUC, DSS) and plasticity; calibrate locally. Use Nkt toward upper end for conservative Su.
Example 7-2 — Vane Shear Test with Bjerrum Correction, CN Great Lakes Alignment

Context: CN requires VST data to assess embankment stability adjacent to a soft lacustrine clay deposit near the south shore of Lake Erie. VST results at 18 ft depth:

  • T_peak = 12.4 lb·ft
  • T_remolded = 3.1 lb·ft
  • Standard vane: D = 2.24 in. = 0.187 ft; H/D = 2
  • PI = 55% (from Atterberg limits, Chapter 10)

Step 1 — Peak s_u (Eq. 7-6):

s_u (peak) = 6 × T_peak / (7 × π × D³)

= 6 × 12.4 / (7 × 3.1416 × 0.187³)

= 74.4 / (7 × 3.1416 × 0.00654)

= 74.4 / 0.14397

= 516.8 psf = 0.258 tsf

Step 2 — Remolded s_u:

s_u (remolded) = 6 × 3.1 / (7 × π × 0.187³)

= 18.6 / 0.14397

= 129.2 psf

Step 3 — Sensitivity (Eq. 7-8):

S_t = 516.8 / 129.2 = 4.0

S_t = 4.0 — medium sensitivity. CN's trigger for enhanced seismic review is S_t > 8; this site does not trigger that requirement.

Step 4 — Bjerrum correction (Eq. 7-7, PI = 55%, μ = 0.78 interpolated):

s_u (design) = 0.78 × 0.258 = 0.201 tsf = 402 psf

Interpretation: Design s_u = 402 psf is used in the slope stability model (Chapter 13). Uncorrected vane data (516 psf) would have overestimated embankment stability by approximately 29%. Per CN Engineering Standards, Bjerrum correction is mandatory for all VST data used in embankment design.

Example 7-3 — MASW Site Class Determination, UPRR Intermodal Facility

Context: UPRR requires AASHTO seismic site classification for a new intermodal facility in the Mid-Continent region. MASW inversion yields:

LayerThickness d_i (ft)V_si (ft/s)
112480
228920
3351,650
4253,200

Total depth = 100 ft. Apply Equation 7-16:

Numerator: Σd_i = 12 + 28 + 35 + 25 = 100 ft

Denominator: Σ(d_i / V_si):

= 12/480 + 28/920 + 35/1,650 + 25/3,200

= 0.02500 + 0.03043 + 0.02121 + 0.00781

= 0.08445 s/ft × ft = 0.08445 s

V_s,30 = 100 / 0.08445 = 1,185 ft/s

Site Class D (600–1,200 ft/s — stiff soil). Per AREMA MRE Chapter 8 and UPRR Engineering Instruction Manual, Site Class D triggers the use of site amplification factors F_a and F_v in seismic design. G_max for the upper layer:

G_max = (120/32.2) × 480² = 3.727 × 230,400 = 858,893 psf ≈ 429 tsf

This is the baseline stiffness for subgrade support under 286K–315K GRL loading.

7.10 Representative In Situ Test Data Table
Table 7-1. Example CPTu Sounding Data — BNSF Soft Ground Characterization, Pacific Northwest
Depth (ft)q_c (tsf)f_s (psi)u₂ (psi)R_f (%)SBT Zones_u (psf)B_q
53.10.308.21.044 — Silt mix3820.28
102.40.4811.62.313 — Clay2980.42
151.80.5414.33.463 — Clay2240.59
201.60.6116.14.171 — Sensitive clay1990.72
252.10.4413.82.413 — Clay2620.48
308.70.329.40.426 — Clean sand—0.04
3522.40.187.60.098 — Dense sand—0.01

B_q > 0.5 at 15–20 ft depth indicates soft, sensitive clay layer — triggers VST verification per BNSF Engineering Instructions for soft-ground embankment design.

7.11 Figure Placeholders
  • Figure 7-1: Schematic of CPTu cone with u₂ filter position and area ratio definition.
  • Figure 7-2: Robertson (1990) SBT chart — Q_t vs. F_r axes with zone boundaries.
  • Figure 7-3: Representative CPTu sounding log — q_t, f_s, u₂, s_u profiles vs. depth.
  • Figure 7-4: Field vane shear test torque-vs.-rotation curve showing peak and remolded response.
  • Figure 7-5: Bjerrum correction factor μ vs. Plasticity Index curve.
  • Figure 7-6: PMT pressure-volume expansion curve with E_PMT slope and p_L identified.
  • Figure 7-7: DMT blade schematic showing A and B readings; typical I_D and K_D profile.
  • Figure 7-8: MASW field layout — geophone array, impact source, and example dispersion curve.
  • Figure 7-9: MASW inversion output — V_s profile with confidence band vs. depth.
  • Figure 7-10: Seismic refraction travel-time graph — two-layer model with crossover point.

Reference graphics

Cone Penetration Test
Cone Penetration Test
Vane Shear Test
Vane Shear Test
Pressuremeter Tests
Pressuremeter Tests
7.12 Practical Recommendations
  1. Require CPTu (not basic CPT) on all Amtrak NEC and CSXT soft-ground projects. The u₂ measurement is indispensable for consolidation state assessment and liquefaction screening, and Amtrak ES explicitly requires it. Equip the sounding rig with a calibrated piezocone with a net area ratio certificate and saturation log.
  2. Always apply Bjerrum correction to VST data before using s_u in design. Uncorrected vane strength overestimates stability by 15–30% in plastic clays common along CSXT, CN, and G&W Gulf Coast alignments. Record PI from concurrent Atterberg limit tests (Chapter 10) at every VST location.
  3. Use MASW proactively on UPRR and BNSF heavy-haul corridors before committing to deep-boring campaigns. A single 500-ft MASW transect at 10-ft spacing establishes lateral variability, identifies soft zones warranting targeted borings, and provides G_max for dynamic subgrade analyses — typically at lower total cost than the equivalent number of borings.
  4. Pair seismic refraction with geologic mapping on NSR Appalachian and CPKC Rocky Mountain projects. Refraction P-wave velocities calibrated against core borings at key control points reduce the number of exploratory borings required for rock cut designs by up to 40%, a cost argument that resonates strongly with NSR's competitive bid procurement process.
  5. Specify and record DMT membrane stiffness correction factors (ΔA, ΔB) in field logs. BNSF and UPRR have rejected DMT data packages that omitted calibration records. Recalibrate the membrane every 200 soundings or whenever it is replaced; document calibration dates in the test log submitted with the gINT data package.
  6. Validate CPTu-derived s_u with at least one VST or UU triaxial test per distinct soil unit on CN and G&W projects. The empirical N_kt factor varies from 10 to 18 depending on clay mineralogy and stress history; site-specific calibration is expected by CN Engineering Standards and reduces uncertainty in stability analyses.
  7. Consult CPKC Engineering Track Standards before mobilizing in-track CPT equipment. CPKC requires a track time application (TA) and on-track protection plan; the sounding rig must be highway-rail compatible and meet CPKC equipment clearance requirements. Plan for 4-hour minimum track occupancy windows per sounding location.
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-14 Undrained shear strength from CPT SᵤUse: Fine-grained soils penetrated undrained (Ic > ~2.6). Limits: Nkt depends on reference test (vane, CIUC, DSS) and plasticity; calibrate locally. Use Nkt toward upper end for conservative Su.
  • IS-23 Flat dilatometer (DMT) intermediate parameters I_D, K_D, E_DUse: All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand. Limits: ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).
  • IS-25 Field vane strength correction Sᵤ (field)Use: Soft clays, embankment stability on soft ground; based on back-analyzed failures. Typical PI 5–100%. Limits: Not applicable to fissured, varved, or organic clays without local calibration. Scatter about ±25%.
  • IX-13 Small-strain shear modulus (Hardin) G_maxUse: Uncemented clays and sands; lab resonant-column basis. Limits: Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.
7.13 Field Operations Checklist — In Situ Testing

Checklist · Part V · Subsurface Exploration

Field Operations Checklist — In Situ Testing

Pre-Mobilization0 of 7
During Testing0 of 7
Post-Testing0 of 5
Ticks are saved in this browser.
Plain text version

Pre-Mobilization

  • [ ] Railroad flagging / RWP certification confirmed for CSXT, NSR, UPRR, BNSF, CPKC, Amtrak, CN, or applicable G&W subsidiary
  • [ ] CPTu cone calibration certificate on file (cone tip area, sleeve area, net area ratio a, piezocone saturation method)
  • [ ] DMT membrane calibration (ΔA, ΔB values) recorded and logged
  • [ ] VST vane dimensions measured and recorded; blade condition inspected
  • [ ] MASW geophone spacing and array length laid out per project plan
  • [ ] Seismic refraction geophone array and shot locations staked; shot holes pre-drilled if needed
  • [ ] GPS receiver verified for State Plane coordinate capture matching client requirements (CSXT NAD 83; NSR FIPS 4501; CN UTM NAD 83)

During Testing

  • [ ] CPTu: verify push rate 0.8 in./s ± 20%; log zero readings before each push; record u₂ during hold periods
  • [ ] CPTu: flush and resaturate piezocone filter if u₂ readings become erratic
  • [ ] VST: confirm push depth before rotation; record peak torque to nearest 0.1 lb·ft; rotate 10 full turns for remolded; record time to remolding
  • [ ] PMT: log borehole diameter at test depth; confirm membrane inflation rate and hold time per ASTM D4719
  • [ ] DMT: record A and B readings at each 8-in. depth increment; note any membrane replacement
  • [ ] MASW: record field dispersion curve in real time; flag reversal zones for re-processing
  • [ ] Seismic refraction: record all first arrivals on paper and digital; verify forward and reverse shoots for layer dip assessment

Post-Testing

  • [ ] CPTu data downloaded in raw format and backed up; verify no dropped readings
  • [ ] gINT data entry complete with test type, date, operator, cone serial number, calibration reference
  • [ ] QA review of travel-time plots (refraction), dispersion curves (MASW), and CPTu profiles before demobilization
  • [ ] Coordinate data submitted to project GIS per client requirements (ESRI shapefile for CSXT/BNSF; AutoCAD Civil 3D for Amtrak; PDF logs for G&W)
  • [ ] Site restoration completed per railroad RWP close-out procedures
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-23 Flat dilatometer (DMT) intermediate parameters I_D, K_D, E_DUse: All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand. Limits: ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).
7.14 Practice Questions

Question 3-1 A CPTu sounding on an NSR bridge approach fill yields the following at 30 ft depth: q_c = 6.80 tsf, u₂ = 0.95 tsf, net area ratio a = 0.82, total stress σ_v = 1.95 tsf. Calculate (a) corrected tip resistance q_t and (b) undrained shear strength s_u using N_kt = 13.

Answer 3-1: (a) q_t = q_c + u₂ × (1 − a) = 6.80 + 0.95 × (1 − 0.82) = 6.80 + 0.171 = 6.971 tsf (b) s_u = (q_t − σ_v) / N_kt = (6.971 − 1.95) / 13 = 5.021 / 13 = 0.386 tsf = 772 psf This s_u would be classified as medium clay (Chapter 8) and is suitable input for NSR bridge abutment bearing capacity calculations (Chapter 11).

Question 3-2 A VST at 12 ft depth in a CN lacustrine clay deposit yields T_peak = 8.6 lb·ft and T_remolded = 1.4 lb·ft. Standard vane D = 0.187 ft. Plasticity Index = 70%. Calculate (a) peak s_u, (b) sensitivity S_t, (c) design s_u after Bjerrum correction, and (d) determine whether CN's enhanced seismic review is triggered.

Answer 3-2: (a) s_u (peak) = 6 × 8.6 / (7 × π × 0.187³) = 51.6 / 0.14397 = 358.4 psf = 0.179 tsf (b) s_u (remolded) = 6 × 1.4 / 0.14397 = 58.3 psf; S_t = 358.4 / 58.3 = 6.1 (c) μ for PI = 70%: interpolate between 65% (μ = 0.72) and 80% (μ = 0.65) → μ ≈ 0.70; s_u (design) = 0.70 × 0.179 = 0.125 tsf = 250 psf (d) S_t = 6.1 < 8.0 — CN's enhanced seismic review threshold is not triggered, but the site is classified as sensitive and warrants careful embankment load staging.

Question 3-3 An MASW survey on a BNSF soft-ground site yields V_s,30 = 580 ft/s. The upper soil layer has γ = 110 pcf and V_s = 410 ft/s. Determine (a) AASHTO site class, (b) G_max for the upper layer in tsf, and (c) the significance for BNSF Engineering Instructions.

Answer 3-3: (a) V_s,30 = 580 ft/s < 600 ft/s → Site Class E (soft clay) (b) ρ = 110 / 32.2 = 3.416 slug/ft³; G_max = 3.416 × 410² = 3.416 × 168,100 = 574,390 psf / 2,000 = 287 tsf (c) Site Class E requires BNSF to apply maximum seismic amplification factors (F_a and F_v) per AREMA MRE Chapter 8, and BNSF Engineering Instructions require a site-specific seismic response analysis rather than the standard code-based approach. Additionally, G_max = 287 tsf indicates a very soft subgrade; BNSF's track modulus specifications for this corridor may require ground improvement (Chapter 17) before track installation.

Question 3-4 Seismic refraction on an NSR rock cut project yields V₁ = 3,800 ft/s, V₂ = 9,200 ft/s, and crossover distance x_c = 48 ft. Calculate (a) depth to rock and (b) whether blasting is required per the rippability table.

Answer 3-4: (a) Using Equation 7-18:

h = (48/2) × √((9,200 − 3,800)/(9,200 + 3,800))

= 24 × √(5,400 / 13,000)

= 24 × √0.4154

= 24 × 0.6445

= 15.5 ft

Depth to rock ≈ 15.5 ft. (b) V₂ = 9,200 ft/s falls in the "Difficult" rippability category (8,000–12,000 ft/s); blasting is likely required. NSR's Engineering Standards Manual requires advance notification to NSR ROW management and coordination with state explosive use permits before blasting within 200 ft of active track.

Question 3-5 A DMT at 14 ft depth in a CSXT embankment foundation yields corrected pressures p_0 = 1,240 psf and p_1 = 3,860 psf. Effective vertical stress σ'_v = 780 psf; hydrostatic u₀ = 0. Calculate (a) I_D, (b) K_D, (c) E_D, and (d) M_DMT. Classify the soil type.

Answer 3-5: (a) I_D = (p_1 − p_0) / (p_0 − u₀) = (3,860 − 1,240) / (1,240 − 0) = 2,620 / 1,240 = 2.11 → Sand (I_D > 1.8) (b) K_D = (p_0 − u₀) / σ'_v = 1,240 / 780 = 1.59 (c) E_D = 34.7 × (p_1 − p_0) = 34.7 × 2,620 = 90,914 psf ≈ 45.5 tsf (d) For sand (I_D > 3.0): R_M = 1.0; M_DMT = 1.0 × 90,914 = 90,914 psf ≈ 45.5 tsf K_D = 1.59 ≈ K₀ for NC sand; OCR ≈ (1.59/1.5)^1.56 ≈ 1.09 — essentially normally consolidated. This M_DMT value is input to the immediate settlement calculation for the CSXT embankment widening (Chapter 12).

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-14 Undrained shear strength from CPT SᵤUse: Fine-grained soils penetrated undrained (Ic > ~2.6). Limits: Nkt depends on reference test (vane, CIUC, DSS) and plasticity; calibrate locally. Use Nkt toward upper end for conservative Su.
  • IS-23 Flat dilatometer (DMT) intermediate parameters I_D, K_D, E_DUse: All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand. Limits: ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).
  • IS-25 Field vane strength correction Sᵤ (field)Use: Soft clays, embankment stability on soft ground; based on back-analyzed failures. Typical PI 5–100%. Limits: Not applicable to fissured, varved, or organic clays without local calibration. Scatter about ±25%.
  • IX-09 At-rest earth pressure coefficient K₀Use: Uncemented soils on primary unloading. Limits: Not valid on reloading or for compacted fills, where K0 is governed by compaction stresses. Cap at passive limit.
  • IX-13 Small-strain shear modulus (Hardin) G_maxUse: Uncemented clays and sands; lab resonant-column basis. Limits: Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.
Cross-References
  • Chapter 6 — SPT corrections: SPT vs. CPT comparison; energy efficiency basis; SPT-CPT conversion (Robertson & Campanella)
  • Chapter 8 — Soil classification: SBT chart zone assignments; USCS correlation from CPT I_D
  • Chapter 11 — Bearing capacity: s_u from VST/CPTu used in undrained bearing capacity of spread footings and pile tip resistance
  • Chapter 12 — Settlement analysis: M_DMT as M_v substitute; OCR from K_D for preconsolidation stress estimation
  • Chapter 13 — Slope stability: Bjerrum-corrected s_u as undrained strength input for embankment stability
  • Chapter 14 — Seismic/liquefaction: q_c1N from CPTu for CRR; B_q for pore pressure generation assessment; G_max from MASW for site response
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

  • USACE EM 1110-1-1804, Geotechnical Investigations (2001), Sections 4-5 through 4-12
  • ASTM D5778, D2573, D4719, D6635, D7128
  • AREMA MRE Chapter 1

Supplemental sources (LEVI Library)

  • Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.
  • Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2)
  • U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802
  • McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky

File locations for these documents are listed under Supplemental Sources — LEVI Library.

Supplemental Sources — LEVI Library

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced.

  1. Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.
  2. Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2)
  3. U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802
  4. McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky
  5. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)
  6. Benesch. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. Colwell
  7. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 4 and 10
← Previous · Part V Chapter 6 — Borings and Sampling
Next · Part V → Chapter 8 — Soil and Rock Classification