Railway Ground Hazard Risk Management is Benesch's geotechnical reference for railroad clients. It is organized around the way ground hazards affect track. It starts with the risk framework, then the track substructure that has to be protected, then the ways that substructure fails, and then how to explore, analyze and stabilize it. Formerly titled Benesch Geo Rail, the manual was reorganized in September 2026 into nine parts.
It is written for Benesch geotechnical engineers, geologists and field staff delivering investigation, design, construction-phase and ground hazard risk management services to Class I, regional and short line railroads, and to passenger and commuter operators.
Benesch’s two-day Geotechnology for Railroaders course (Modules 1–8) is the field-training companion to this manual. Its concepts, case histories, field photographs and job-aid figures are cited in the chapters below. Use the course for crews and inspectors, and this manual for the engineering basis behind it.
| Course module | Where it appears in this manual |
|---|---|
| 1 — Risk Management of Geo-Hazards | Chapter 1 (risk equation, classification, case histories, stabilization program) |
| 2 — Geology and Soil Engineering | Chapters 5, 6, 8, 10 and 18 (landforms, sampling, field identification, subgrade strength by feel) |
| 3 — Track Substructure: Ballast and Sub Ballast | Chapters 2 and 3 (ballast functions, fouling, undercutting, sub ballast, bridge approaches) |
| 4 — Track Drainage | Chapters 2, 3 and 9 (cardinal rules, ditches, subdrains, culvert inspection) |
| 5 — Slides and Instabilities | Chapters 4 and 13 (downhill and uphill slide categories, the four don’ts, signs of instability) |
| 6.1 — Slope Stabilization | Chapters 13 and 16 (berms, realignment, driven and gravity walls, soil nailing) |
| 6.2 — Subgrade Stabilization | Chapters 11, 15 and 17 (geosynthetics, HMA underlayment, grouting, EPS, screw piles) |
| 6.3 — Scour and Erosion | Chapter 4 (scour mechanisms, countermeasures) |
| 6.4 — Rock Falls | Chapters 4 and 13 (rockfall strategies, incident reporting) |
| 6.5 — Beaver Dams | Chapter 4 (BAHA program, uphill dams, rapid drawdown) |
| 6.6 / 7.1 — Winter Problems, Spring Thaw | Chapters 2, 4 and 13 (frost heave, spring silt liquefaction, rapid drawdown) |
| 7.2 / 7.3 — Extreme Weather, Earthquakes | Chapters 4 and 14 (event declaration, precipitation indices, seismic response criteria) |
After Geotechnology for Railroaders Program, Module 1; course menu. Full reference under Supplemental Sources.
The manual is supported by a small set of apps on dirtbert.com. They run in any current web browser (Chrome, Edge, Safari or Firefox) on a desktop, laptop, tablet or phone. There is nothing to install and no account to create, except where a sign-in is noted below.
| App | What it does | On a desktop | On a phone | Where your work is kept |
|---|---|---|---|---|
| GHRM | This manual: nine parts, 18 chapters and the appendices. | Each chapter opens with an On this page list at the left and the section train across the top. Select a section heading to open it; Expand all opens every section. | The page narrows to one column and On this page folds into a button at the top: tap it, then tap a section. Turn the phone sideways for wide tables. | Checklist ticks are saved in this browser on this device. |
| MINA Hazard Monitoring | Live river stage, flood, weather and tornado hazards along a railroad, with mileposts, bridges, crossings, rivers, soils and geology on one map. | Desktop layout: the map setup panel, watchlist and hazard feed sit beside the map. Open full screen fills the monitor. | Phone layout: the map fills the screen, with Map Setup, Gauges, Alerts and Status tabs along the bottom. | Nothing is stored. The layout you pick is remembered in the browser. Data loads live from public sources, so a connection is needed. |
| NANCY Project Workflow | One project carried through seven phases, from project set-up to the geotechnical report, with the Project Data pages: field log, boring log, laboratory results, design parameters and the two reports. | Best for entering borings, samples and test results with a keyboard. Work the phases in order; you can go back to any earlier phase. | Works for reviewing a project and for quick entries in the field. Wide tables scroll sideways. | Only in this browser on this device. Use Save file to keep a copy or move the project to another computer or phone, and Open file to load it there. Clearing browser data deletes the stored project. |
| GHRM Tools, Analytical Tools and the Calculator Map | Calculators, workbook guides and field forms from the Geotechnical Analysis Suite, listed by discipline or by manual chapter. | Calculators open in a new tab. The orange Analytical Tools for this Chapter card at the top of each chapter, and the orange strips inside sections, link straight to them. | Calculators work on a phone; the workbook guides read best on a larger screen. | The calculators are in the Benesch area of dirtbert.com and need a Benesch sign-in. |
| Ground Improvement Technology Selector | Narrows the 45 techniques of the technology library (17.16) to the ones that fit the problem and site. | Opens beside Chapter 17. | Same page, one column. | Nothing is stored. |
Opening MINA picks the layout for the device: phones get the phone layout and everything else gets the full-screen desktop layout. To switch, use Phone view on the desktop layout or Desktop on the phone layout; the choice is remembered in that browser. Then set up the map in four steps:
The river stage watchlist lists gauges near the line against their flood stages, and the hazard feed lists warnings on the selected network. MINA is a monitoring aid; it is not for operational dispatch decisions.
NANCY asks every user to read and accept the Use and Disclaimers once in each browser before its pages open; the acceptance is remembered after that. Start at NANCY and work the phases in order. Each phase page explains what is done and why, and links to the Project Data pages and the chapters of this manual that support it. Borings and samples entered on the field log appear on the boring log, laboratory results attach to their samples, and each stratum’s tested values become its design parameters. Where a property has no test, NANCY uses a conservative published correlation and marks the value as assumed.
Because the project is kept only in the browser, save a file at the end of each session. To move between a desktop and a phone, use Save file on one device and Open file on the other. Every value NANCY produces must be checked by a qualified, licensed engineer.
Open the app in the phone’s browser and add it to the home screen so it opens like an app:
Good candidates are MINA’s phone layout, NANCY, and the chapter you use most in the field.
Several sections of this manual draw on Profillidis, Railway Management and Engineering, which is written to UIC and European (EN) practice in metric units. AREMA and FRA remain the governing basis for North American work; the European material is included for the mechanics, the data and the design logic behind it. The terms and units below appear wherever that material is cited.
| European / UIC term | North American equivalent or conversion |
|---|---|
| Sleeper | Tie (crosstie) |
| Track bed | Ballast + subballast together |
| Formation layer | Engineered top-of-subgrade layer; comparable in role to a blanket or prepared subgrade layer |
| Subsoil | Native or embankment fill below the formation layer |
| Cant / cant deficiency | Superelevation / unbalanced superelevation |
| Longitudinal, transverse, horizontal defect | Surface (profile), cross-level, alignment |
| t (metric tonne) — axle load | 1 t = 2,205 lb; a 286,000-lb car on 4 axles ≈ 32.4 t/axle |
| kp/cm² (kilopond per cm²) | 1 kp/cm² ≈ 14.2 psi |
| t/mm (track or layer reaction coefficient) | 1 t/mm ≈ 56 kip/in. |
| ‰ (per mille) gradient | 10‰ = 1.0% grade |
| MGT / million tons of traffic | Same concept; UIC counts gross metric tons |
UIC axle-load categories for standard gauge: A = 18 tons, B = 20 tons, C = 22 tons, D = 25 tons. Profillidis notes that standard-gauge axle loads in the USA are 28–35 tons, so European design charts calibrated to 22–25 tons sit well below North American heavy-haul loading. Rail stress is reported to grow roughly with Q3 to Q4 (Q = axle load), so a modest axle-load increase produces a much larger increase in fatigue.
UIC line groups (UIC Code 714R) classify lines by a fictitious daily tonnage Tth that weights freight, locomotive and speed effects: group 1 > 130,000 t/day; group 2 = 80,000–130,000; group 3 = 40,000–80,000; group 4 = 20,000–40,000; group 5 = 5,000–20,000; group 6 < 5,000 t/day. Group 4 is described as representative of most lines worldwide. Several UIC thickness and maintenance rules in this manual are keyed to these groups.
Regulation, specification, code, standard and guideline are not interchangeable. In the book’s usage, regulations and specifications are rules issued by governmental or inter-governmental bodies that impose specific instructions or methods; codes are a form of legislation defining a procedure or performance to be followed; standards are uniform criteria developed by a national or international body and are suggested rather than obligatory; guidelines are non-mandatory recommendations.
After Profillidis (2014), §7.5 (axle and traffic load), §12 footnote (definitions). Conversions added by Benesch. Full reference under Supplemental Sources.
Many values in railway geotechnical work are estimated from empirical equations: SPT and CPT correlations for strength and stiffness, index-property correlations for compressibility and permeability, rock-mass ratings, and landslide runout and rainfall-threshold relations. The manual collects 60 of them in the Empirical Equations & Correlations reference, each with its formula, original source, the data it was fitted to, and the constraints on its use.
Every equation is a statistical fit to a specific data set. Use it only within the stated materials and ranges, prefer site-specific calibration, and confirm coefficients against the cited original before relying on a result for design.
Note required when an equation is used. Wherever a correlated value appears — a calculation, a boring log, a design-parameter table, a report or a GHRM assessment — record with it:
Each chapter has an Empirical Equations — Use and Limitations card listing the equations it uses, and an Empirical equation note box closes each section that refers to one. The Geotechnical Analysis Suite workflow adds the same note wherever it uses a correlation (preliminary anticipated results, assumed design parameters, the report).
| ID | Equation | Family | Used in (or applies to) |
|---|---|---|---|
| IS-01 | SPT energy & procedure correction | In-situ tests | Appendices; Chapter 5; Chapter 6; Chapter 11; Chapter 14; Chapter 15; Appendix E |
| IS-02 | SPT overburden normalization (sands) | In-situ tests | Appendices (applies); Chapter 5 (applies); Chapter 6; Chapter 14; Appendix E |
| IS-03 | Relative density of sand from SPT | In-situ tests | Chapter 6 (applies); Chapter 17 (applies) |
| IS-04 | Friction angle of sand from SPT (Schmertmann form) | In-situ tests | Chapter 11 (applies); Chapter 16 (applies) |
| IS-05 | Friction angle of sand from SPT (Peck–Hanson–Thornburn) | In-situ tests | Chapter 6 (applies); Chapter 11 (applies); Chapter 16 (applies) |
| IS-06 | Friction angle of sand from SPT (Hatanaka & Uchida) | In-situ tests | Chapter 11 (applies) |
| IS-07 | Undrained shear strength of clay from SPT | In-situ tests | Chapter 6 (applies); Chapter 11 (applies); Chapter 13 (applies); Chapter 14; Chapter 2 (applies); Appendix E; Chapter 3 (applies) |
| IS-08 | Drained Young's modulus of sand from SPT | In-situ tests | Chapter 12 (applies) |
| IS-09 | Shear-wave velocity from SPT | In-situ tests | Chapter 14 (applies) |
| IS-10 | OCR of clay from SPT | In-situ tests | reference only |
| IS-11 | Cyclic resistance ratio of sand from SPT | In-situ tests | Chapter 14 |
| IS-12 | Corrected cone resistance | In-situ tests | Chapter 7; Chapter 14; Chapter 15 (applies) |
| IS-13 | Soil behaviour type index (normalized) | In-situ tests | Chapter 7 (applies); Chapter 14 |
| IS-14 | Undrained shear strength from CPT | In-situ tests | Chapter 7; Chapter 11 (applies); Chapter 13 (applies); Chapter 17 |
| IS-15 | Friction angle of sand from CPT | In-situ tests | Chapter 7 (applies); Chapter 11 (applies) |
| IS-16 | Relative density of sand from CPT | In-situ tests | Chapter 7 (applies); Chapter 17 (applies) |
| IS-17 | Preconsolidation stress / OCR from CPT | In-situ tests | Chapter 7 (applies); Chapter 12; Chapter 17; Chapter 15 (applies) |
| IS-18 | Shear-wave velocity from CPT | In-situ tests | Chapter 7; Chapter 14; Chapter 2 |
| IS-19 | Constrained modulus from CPT | In-situ tests | Chapter 7 (applies); Chapter 12 (applies); Chapter 17 (applies) |
| IS-20 | Hydraulic conductivity from CPT | In-situ tests | Chapter 7 (applies); Chapter 9 (applies); Chapter 17 |
| IS-21 | Soil unit weight from CPT | In-situ tests | Chapter 7 (applies); Chapter 18 (applies) |
| IS-22 | Cyclic resistance ratio of sand from CPT | In-situ tests | Chapter 14 |
| IS-23 | Flat dilatometer (DMT) intermediate parameters | In-situ tests | Chapter 7 |
| IS-24 | OCR, K₀ and Sᵤ of clay from DMT | In-situ tests | Chapter 7 |
| IS-25 | Field vane strength correction | In-situ tests | Chapter 7; Chapter 8; Chapter 13 |
| IX-01 | Compression index from liquid limit (undisturbed) | Index properties | Chapter 5 (applies); Chapter 8 (applies); Chapter 12 (applies); Chapter 10 (applies) |
| IX-02 | Compression index from liquid limit (remolded) | Index properties | Chapter 12 (applies); Chapter 10 (applies) |
| IX-03 | Compression index from void ratio | Index properties | Chapter 12 (applies); Chapter 10 (applies) |
| IX-04 | Compression index from plasticity index | Index properties | Chapter 8 (applies); Chapter 12 (applies); Chapter 10 (applies) |
| IX-05 | Secondary compression ratio | Index properties | Chapter 12; Chapter 2 (applies); Chapter 15 (applies); Chapter 10 (applies); Chapter 3 |
| IX-06 | Normalized undrained strength from plasticity | Index properties | Chapter 13 (applies); Chapter 10 (applies) |
| IX-07 | SHANSEP undrained strength ratio | Index properties | Chapter 13 (applies) |
| IX-08 | Friction angle of NC clay from plasticity | Index properties | Chapter 13 (applies); Chapter 16 (applies); Chapter 10 (applies) |
| IX-09 | At-rest earth pressure coefficient | Index properties | Chapter 7; Chapter 16; Chapter 3 (applies) |
| IX-10 | Undrained strength from liquidity index | Index properties | Chapter 8; Chapter 18 (applies); Chapter 10 (applies) |
| IX-11 | Hazen hydraulic conductivity | Index properties | Chapter 9 (applies); Chapter 17 (applies); Chapter 10 (applies) |
| IX-12 | Chapuis hydraulic conductivity | Index properties | Chapter 9 (applies) |
| IX-13 | Small-strain shear modulus (Hardin) | Index properties | Chapter 7; Chapter 14 (applies); Chapter 2 (applies); Chapter 10 (applies) |
| RK-01 | Rock Mass Rating (RMR₈₉) | Rock mass & rockfall | Chapter 5 (applies); Chapter 8 |
| RK-02 | Rock mass quality (Q-system) | Rock mass & rockfall | Chapter 8 |
| RK-03 | RMR–Q conversion | Rock mass & rockfall | Chapter 8 (applies) |
| RK-04 | RQD from volumetric joint count | Rock mass & rockfall | Chapter 6 (applies); Chapter 8 (applies) |
| RK-05 | GSI from RMR₈₉ | Rock mass & rockfall | Chapter 8 |
| RK-06 | Slope Mass Rating | Rock mass & rockfall | Chapter 13 (applies); Chapter 1 (applies); Chapter 4 (applies) |
| RK-07 | Generalized Hoek–Brown criterion | Rock mass & rockfall | Chapter 11 (applies); Chapter 13 (applies) |
| RK-08 | Rock mass deformation modulus | Rock mass & rockfall | Chapter 14 |
| RK-09 | Joint shear strength (Barton–Bandis) | Rock mass & rockfall | Chapter 13 (applies) |
| RK-10 | UCS from point load index | Rock mass & rockfall | Appendices; Chapter 5; Chapter 6; Chapter 8 (applies); Chapter 18; Chapter 2; Chapter 10 |
| RK-11 | Rockfall shadow angle | Rock mass & rockfall | Chapter 1 (applies); Chapter 4 (applies) |
| RK-12 | Rockfall Hazard Rating System scoring | Rock mass & rockfall | Chapter 1 (applies); Chapter 4 |
| LS-01 | Reach angle (Fahrböschung) vs. volume — rock avalanches | Landslide & debris flow | Chapter 1 (applies); Chapter 4 (applies) |
| LS-02 | Reach angle vs. volume — all landslide types | Landslide & debris flow | Chapter 1 (applies) |
| LS-03 | Debris-flow travel distance | Landslide & debris flow | Chapter 1 (applies); Chapter 4 (applies) |
| LS-04 | Debris-flow peak discharge | Landslide & debris flow | Chapter 1 (applies) |
| LS-05 | Debris-flow inundation area (LAHARZ-type) | Landslide & debris flow | Chapter 1 (applies) |
| LS-06 | Debris-flow velocity from superelevation | Landslide & debris flow | Chapter 4 (applies) |
| LS-07 | Landslide volume from area | Landslide & debris flow | Chapter 1 (applies) |
| LS-08 | Rainfall intensity–duration threshold (Caine) | Landslide & debris flow | Chapter 1 (applies); Chapter 4 |
| LS-09 | Rainfall intensity–duration threshold (global update) | Landslide & debris flow | Chapter 1 (applies); Chapter 4 (applies) |
| LS-10 | Newmark sliding displacement (regression) | Landslide & debris flow | Chapter 14; Chapter 1 (applies); Chapter 4 (applies) |
Sections on this page marked “After Profillidis (2014)” draw on the document below. Text is summarized or paraphrased; tables are transcribed or reproduced with their original source noted; figures and photos are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design.
Authors: Daniel P. Colwell and Mario Ruel. This part was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
This part summarizes and organizes material from the chapters that follow; see the Author and Sources section at the end of each chapter for the works cited.