dirtbert
Geotechnical engineering library
Contact

GHRM Tools · Geotechnical Analysis Suite

Analytical Tools

Design calculators, workbook guides, field forms and data templates for railroad geotechnical work, grouped by discipline: Lab Testing, Density, Pavements, Deep Foundations, Shallow Foundations and Slope Stability, with project forms and data templates at the end. Calculators marked GEO5 follow the GEO5 engineering manuals and reproduce their worked examples.

Draft · pending Benesch final review · not for use in design

168Workbook tools
54Calculators
11Categories
6Workflow phases

Project Workflow

One project carried through six phases. What is entered once flows into every later step, calculator and report.

REF

Empirical Geotechnical & Civil Formulas

A searchable library of empirical correlations and design formulas.

Open

Tool Catalogue

Tools are grouped by discipline, with subgroups inside each group and interactive calculators listed first. Tools marked Open run as an interactive calculator; the rest open their workbook guide. You can also view the tools by the manual chapter they support.