MINA · how-to
Using MINA a guided walkthrough
Why MINA looks at ground and water together, how to set up the hazard map, read what it shows you, rank the track to inspect first, and get the word out. About 9 minutes (8:57). The script scrolls along the bottom of the screen, set to Ravel’s Boléro.
Try it now
Open the map and follow along: pick a network, choose a quick view, launch, then rank the track in view.
Music: Maurice Ravel, Boléro, recording by Omega13a (MuseScore 4), Wikimedia Commons, licensed CC BY 4.0; excerpt, faded and level-adjusted.
Transcript
- 0:01What if you could frame an area on a map, and in one step, build a custom ground hazard risk map for it?
- 0:09And what if that one simple step gave you everything you need to start a ground hazard risk assessment?
- 0:18That information is out there.
- 0:20It's spread across a lot of different databases: soils, geology, flood maps, landslide records, river gauges, weather and warnings.
- 0:32Each one is actively managed and maintained, and the weather and river data change by the minute.
- 0:40Sure, you could gather all of it by hand.
- 0:44You'd open a dozen websites, download files, line them up with the track, and try to work out which milepost is which.
- 0:53That takes hours. And by the time you finish, the weather has moved on.
- 1:01That's why we built MINA.
- 1:06First, a little about how we think about ground hazards.
- 1:10Most washouts, slides and subgrade failures need two things to happen.
- 1:16You need ground that's vulnerable: soft soils, steep slopes, old landslides, or an embankment near a river.
- 1:25And you need water to set it off: heavy rain, a rising river, or a storm moving through.
- 1:32Vulnerable ground on a dry day is usually fine.
- 1:36Heavy rain on solid rock is usually fine.
- 1:40Put the two together, and that's where you need to be looking.
- 1:44So MINA looks at both, for every stretch of track on your screen.
- 1:52Everything in MINA is tied to a specific railroad or state DOT.
- 1:58You don't just see a soil map. You see the soils under your track.
- 2:04And when MINA finds a problem, it doesn't give you a latitude and longitude.
- 2:11It tells you the subdivision and the milepost, the same way your crews talk about the railroad.
- 2:18That means you can answer critical questions in minutes, instead of hours.
- 2:24Where are we exposed right now?
- 2:27Which stretches should we look at first?
- 2:30Who needs to know?
- 2:35Let's take a look around.
- 2:37Across the top is a summary of what you're looking at: the network, the route miles, the river gauges in view, and any active weather warnings.
- 2:48It's a quick read on the whole picture.
- 2:51On the left is Map setup.
- 2:54It walks you through ten steps, in order, so you don't have to know where everything is before you start.
- 3:01The big map in the middle is where everything comes together.
- 3:06Every layer you turn on is trimmed to your track, so you only see what matters to the railroad.
- 3:13On the right is Inspect first.
- 3:16This is where MINA ranks the track, and tells you where to look first. We'll come back to it in a minute.
- 3:24Underneath it, you'll find the river gauges near the line, and a live feed of hazards as they come in.
- 3:34Let's build a map.
- 3:36Step one asks a simple question: are you working with a railroad, or a state DOT?
- 3:43In step two, you pick which one.
- 3:47As soon as you do, MINA loads that network's lines and mileposts.
- 3:53Everything else gets built on top of that, so it always loads first.
- 4:01Step three is the base map, the background for everything else.
- 4:06The default is USGS topographic, because contour lines tell you a lot about slopes, drainage, and where water wants to go.
- 4:16You can also switch to satellite imagery, if you want to see what's actually on the ground.
- 4:22Step four is a shortcut. A quick view sets up a whole scenario in one click.
- 4:29For example, choose Slope and washout risk, and MINA turns on the layers you'd want for that question.
- 4:37You can always adjust them afterward, but it's a fast way to get started.
- 4:45Steps five through nine let you choose your layers, and they're organized from the top down.
- 4:52You start with the track itself: lines, mileposts, bridges and crossings.
- 4:57Then you work down into the ground: soils, geology, boring logs, flood zones, and mapped landslides.
- 5:06Next comes the water and the weather: rainfall, radar and weather warnings, and the river gauges and instruments that monitor conditions along the line.
- 5:18Step ten is a summary of everything you've chosen.
- 5:22If it looks right, click Launch map.
- 5:28Now the map comes to life.
- 5:31Remember, every layer has been filtered to the track. So if you see something, it's near your railroad.
- 5:39Click any feature to find out more about it.
- 5:43Click a river gauge, for example, and you'll see its hydrograph: how high the river is now, how it's been trending, and how close it is to flood stage.
- 5:54That's often the first sign that trouble is on the way.
- 5:58Soils, boring logs, flood maps and old landslides work the same way.
- 6:04Click one, and MINA shows you what it is, and what it means for the ground under the track.
- 6:13This is the heart of MINA.
- 6:16Frame the area you care about on the map, then click Rank the track in view.
- 6:21MINA breaks the track into short segments.
- 6:25For each segment, it adds up two scores.
- 6:29Ground points measure how vulnerable the ground is.
- 6:33Water points measure how much water is acting on it right now.
- 6:38Then it puts the two together. A segment with weak ground and a lot of water rises to the top.
- 6:46Based on the combination, each segment gets a level: High, Elevated, Watch or Low.
- 6:56The results come back as a table, with the highest risk at the top.
- 7:01Each row gives you the level, the subdivision, the mileposts, and the reasons it scored the way it did.
- 7:08You're not just told that a stretch is high risk. You're told why.
- 7:14Click any row, and the map zooms straight to that stretch of track, so you can see it for yourself.
- 7:21The numbers under each level are its ground points and water points.
- 7:27They show you whether a stretch ranks high mainly because of the ground, mainly because of the water, or both.
- 7:37Finding the risk is only half the job.
- 7:40The other half is getting that information to the people who can do something about it.
- 7:46MINA can create a one-page daily brief that you can print or email to your crews, your supervisors, or anyone else who needs to know.
- 7:57You can also set an alert.
- 7:59While MINA is open, it re-ranks the track every five minutes, so if conditions change, you'll know.
- 8:08And you can replay a past storm, like Hurricane Helene, to see how it played out along the line.
- 8:15It's a great way to learn from past events, and to see how MINA would have helped.
- 8:23So that's MINA.
- 8:26Frame your area. Pick your network. Set the scene, launch the map, and rank the track.
- 8:34In a few minutes, you'll know where your track is most at risk, why, and exactly where to send people.
- 8:43Because when the ground and the water line up, you don't want to be hoping for the best.
- 8:49You want to know, and you want to act.